We moved into this house over a year and a half ago and have spent a lot of time dreaming up the things we will do to make it awesome. We are very excited to have started our main floor remodel. But first, some before shots…
In phase 1, which was before we moved in and while I was a very 9 months pregnant (yes, this is Allison, not Steve), included this opening (it was a solid wall), a few can lights and sconces, skim coated most of the walls to get rid of the awful orange peel, some paint, a new window in the dinning room, and a few other little projects. 
Then the backyard was Phase 2. See before here and after here. And it looks even better now, but now is not the time for backyard updates.
So the inside main floor… here are all the before pictures:
Kitchen (worst layout).

Stairs in the entry and hall from the dining to the garage door.
Powder Bathroom and Laundry Room
This is the before floor plan… The issues we’re addressing include: a very small inefficient kitchen, huge garage door hallway with no real purpose, bottle neck hallway from the entry to the kitchen, office space that is cut off from the rest of the house, and an oven in the worst spot ever.
And here’s our new floor plan.. 2 foot kitchen pop out, actual mudroom with lockers, opened up office space and hallways with lots of sweet builtins and great details.
Progress pictures to come..







One Response to “Our House .. Phase 3”